Reconfiguration works to the existing line markings on the exterior deck on the top floor.
Shot Blast existing markings and install new layout.
1 shift
1000m2
Line Marking
Consultancy
We were approached to remove the existing markings on the exterior deck and install and entirely new layout. We had to coordinate these works during quieter times and under a full car park closure of this particular level.
We used a captive shot blaster to remove the existing surface and disposed of the arising’s off site. We then marked out an entirely new layout which now increases parking capacity and allows a more suitable traffic flow system.