This site suffered from extreme flooding due to the under specified and defected drainage, consequently flooding retailers on site.
Replace Linear drainage
Replace Speed Ramps
Refresh Line Marking
3 Weeks
120lm
Drainage
External Works
Line Marking
Current drainage in-situ ran the full length of the site and was heavily defected aswell as under specified. We phased this 120lm area into 3 phases to ensure this Leisure Park can still operate with minimal disruption whilst we undertake our works. We also refreshed & reinstated line markings aswell as installing 3 new speed reduction ramps.
Following instruction from our client, we installed a ACO PD100 F Rated linear channel. With the environment in in mind, these units are manufactured from 100% recycled products.
Due to the delivery vehicles using this route, we installed an industrial F900 rated unit to withstand the weight and maneuvers of these vehicles. We also installed heavy duty speed reduction ramps to slow these vehicles down when using the site.
We can confirm that the system installed was very successful and after numerous heavy downfalls following completion, the retailers have never suffered any further flooding.